LIU Yanyan, YE Shirong, JIANG Peng, HUANG Zhihua, CHEN Hao, DU Zhongj in. Investi gation  to Discontinuit y in  the  IGS Final  Ephemeris and Corresponding Treatment[J]. Geomatics and Information Science of Wuhan University, 2014, 39(10): 1174-1178.
Citation: LIU Yanyan, YE Shirong, JIANG Peng, HUANG Zhihua, CHEN Hao, DU Zhongj in. Investi gation  to Discontinuit y in  the  IGS Final  Ephemeris and Corresponding Treatment[J]. Geomatics and Information Science of Wuhan University, 2014, 39(10): 1174-1178.

Investi gation  to Discontinuit y in  the  IGS Final  Ephemeris and Corresponding Treatment

  • As a consequence of  a dail y data processing strate gyan ad jacent  IGS final  precise  clockproduct  dis pla ys discontinuit y at  the  junction of  two successive days.This will  cause  a jump in positioning results  for  the pseudo-rangeand change all  the  related  ambiguities.These  non-inte ger  cycle  sli ps will  re quire  filterin g to make them converge.In this paperthe magnitude  of  the  jump of  every satellite  for  a seven day cycle  is  investi gated  in detail.Thenbased on the  full  discussion  of  the data processing strate gy of  the  IGS centerthe  reasons  for  discontinuit y and the precision of  the  final  clock product  are  presented.Two  counter measures are  proposedone  is  to  insert  the  jump in  the  satellite clock  datum into  the  IGS clock  productthe other  is  to  estimate  the  clock  datum for  ad jacent  days.Finall y the  results  of  the  two processing strate gies  are  presented.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return