HUANG Shengxiang, LIU Jingnan, WU Xiaoming. GPS Real-time Supervisory System and Its Preliminary Application in the Construction of Face Rockfill Dam[J]. Geomatics and Information Science of Wuhan University, 2005, 30(9): 813-816.
Citation: HUANG Shengxiang, LIU Jingnan, WU Xiaoming. GPS Real-time Supervisory System and Its Preliminary Application in the Construction of Face Rockfill Dam[J]. Geomatics and Information Science of Wuhan University, 2005, 30(9): 813-816.

GPS Real-time Supervisory System and Its Preliminary Application in the Construction of Face Rockfill Dam

  • According to the quality control needs of filling construction of the face rockfill dam, by means of the global satellite positioning technology, the wireless data communication technology, the computer technology and the data processing and analysis technology, and integrating with the roller compaction machine, the GPS real-time supervisory system is developed in this paper.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return