3D Relative Datum Method in Positioning of Main Pylon of Cable-Stayed Bridge
-
Graphical Abstract
-
Abstract
In order to satisfy the demands of the main pylon measure benchmark stakingout and the cable anchor-pipe positioning for cable-stayed bridge,a new Georobot relative datum 3D polar coordinate method is presented.The practice indicates the relative datum 3D polar coordinate method has several advantages,such as,high efficiency,high automation and high precise etc.
-
-