[1]
|
Luo Dean,Zhu Guang,Lu Li,et al.The OverallDeformation Monitoring Based on Three-dimension-al Laser Scanning Technology[J].Bulletin of Sur-veying and Mapping,2005,7:40-42(罗德安,朱光,陆立,等.基于三维激光影像扫描技术的整体变形监测[J].测绘通报,2005,7:40-42)[2] Qiu Dongwei,Liang Qinghuai,Yang Songlin.Bei-jing Subway Tunnel Deformation Monitoring of theWhole Structure[J].Science of Surveying andMapping,2008,1:16-17(邱冬炜,梁青槐,杨松林.北京地铁隧道结构整体变形监测的研究[J].测绘科学,2008,1:16-17)[3] Bai Tingyi.Tunnel Surface Reconstruction Tech-nology Research Based Laser Scanning Data[D].Qingdao:Shandong University of Science and Tech-nology,2010(白廷义.基于激光扫描数据的隧道曲面重建技术研究[D].青岛:山东科技大学,2010)[4] Hou Haimin.Application of 3Dimensional LaserScanner in Qingdao Jiaozhou Bay Tunnel[J].Tun-nel Construction,2010,30(6):693-696(侯 海 民.三维激光扫描仪在青岛胶州湾海底隧道的应用[J].隧道建设,2010,30(6):693-696)[5] Fekete S,Diederichs M,Lato M.Geotechnical andOperational Applications for 3-dimensional LaserScanning in Drill and Blast Tunnels[J].Tunnelingand Underground Space Technology,2010,25(5):614-628[6] Jian Xiao,Tong Peng.Tunnel Deformation Monito-ring Method Based Laser Radar Technology[J].Railway Investigation and Surveying,2011,37(6):19-22(简骁,童鹏.基于地面激光雷达技术的隧道变形监测方法研究[J].铁道勘察,2011,37(6):19-22)[7] Tuo Lei.Subway Tunnel Deformation MonitoringBased on 3DLaser Scanning Data[D].Beijing:Chi-985武 汉 大 学 学 报 · 信 息 科 学 版2014年8月na University of Geosciences(Beijing),Canada:Queen’s University,2012(托雷.基于三维激光扫描数据的地铁隧道变形监测[D].北京:中国地质大学(北京),2012)[8] Li Jian,Wan Youchuan,Jiang Menghua,et al.Tunnel Deformation Monitoring Based Laser Scan-ning Technology[J].Geospatial Information,2012,1:14-17(李健,万幼川,江梦华,等.基于地面激光技术的隧道变形监测技术[J].地理空间信息,2012,1:14-17)[9] Delaloye D.Development of a New Methodology forMeasuring Deformation in Tunnels and Shafts withTerrestrial Laser Scanning(LiDAR)Using EllipticalFitting Algorithms[D].Canada:Queen’s Universi-ty,2012[10]Rok V,Tomaz A,Oskar S,et al.Use of Terrestri-al Laser Scanning Technology for Long Term HighPrecision Deformation Monitoring[J].Sensors,2009,9:9873-9895[11]Liu Shaotang,Pan Jiechen.A Tunnel Overall Con-vergence Deformation Presentation Method[J].Modern Tunnelling Technology,2013,50(10):77-81(刘绍堂,潘洁晨.一种隧道整体收敛变形表达方法[J].现代隧道技术,2013,10:77-81)[12]Chen Yi,Shen Yunzhong,Liu Dajie.A SimpleThree-dimensional Datum Transformation ModelSuitable for a Large Rotation Angle[J].Geomaticsand Information Science of Wuhan University,2004,29(12):1101-1104(陈义,沈云中,刘大杰.适用于大旋转角的三维基准转换的一种简便模型[J].武汉大学学报·信息科学版,2004,29(12):1101-1104)[13]Kou Gang.RTK Positioning Technology and ItsApplication in Piling[D].Shanghai:Tongji Universi-ty,2004(寇刚.RTK技术及其在打桩定位中的应用[D].上海:同济大学,2004)[14]Su Lei.Bridge Monitoring Method Based on 3DLa-ser Scanning[D].Nanjing:Hehai University,2011(苏磊.基于三维激光扫描的桥梁监测方法研究[D].南京:河海大学,2011)[15]Liu Shaotang,Pan Guorong.Sources of Errors andDeformation Analysis of Laser Scanning Based Tun-nel Deformation Monitoring[J].Journal of Rail-way Engineering Society,2013,5:69-74(刘绍堂,潘国荣.基于激光扫描的隧道变形监测的误差来源及变形分析[J].铁道工程学报,2013,5:69-74) |